Interior and Exterior painting in Chicago | Goodman Painters & Decorators Chicago

Chicago Home Services

Flooring Installation in Chicago, IL

Hardwood, engineered, laminate, LVT and tile installed on subfloors that have been levelled and prepared properly first.

Overview

What this service covers

Most flooring failures start underneath. An unlevel or damp subfloor will telegraph through any covering, so we check levels and moisture, level where needed and set out the room before the first board goes down. Those checks belong to the estimate rather than the first day on site; what we look at before pricing a floor covers what that involves.

We install hardwood, engineered board, laminate, luxury vinyl tile and ceramic or porcelain tile, including trims, thresholds and skirting, and we take away the old floor and packaging when we finish.

Who it is for

Whole-home flooring

Single rooms and hallways

Kitchens and bathrooms

Rental turnovers

Offices and retail units

What's Included

Flooring Installation includes

Old floor removal and disposal

Subfloor inspection and levelling

Moisture and damp checks

Underlay and acoustic layers

Hardwood and engineered board

Laminate and luxury vinyl

Trims, thresholds and skirting

Full clean-up and removal

Choosing

Which floor suits which room

There is no best flooring, only a covering that suits a particular room, a particular household and a particular surface underneath. Most people choose from a sample in good light and discover the constraints afterwards, which is the wrong way round. These are the five we install and what actually separates them.

Hardwood

Solid timber boards, and the material most people picture when they think of a wooden floor. It is also the most sensitive of the five: it moves with humidity and it does not forgive standing water or a damp base. Best suited to living space where those conditions can be relied on, and worth being honest about where they cannot.

Engineered board

A real timber wear layer bonded to a more stable core. It looks like solid wood because the surface is wood, but the construction copes with a wider range of conditions than solid boards do. It is often the sensible answer in a property where solid timber would be a risk rather than a preference.

Laminate

A printed decorative surface under a hard wear layer. It is not a timber surface, and it is the least expensive of the wood-look options, which is why it is common in rentals and busy family spaces. Its weak point is the joints: water that sits on a laminate floor rather than being wiped up is what usually finishes it.

Luxury vinyl

Resilient rather than rigid, which makes it quieter and warmer underfoot than a hard floor and far more tolerant of moisture than anything wood-based. It is the usual answer for kitchens, utility rooms and hallways in family homes, and for units where noise transfer to a neighbour is a live issue.

Ceramic and porcelain tile

The hardest wearing of the five and the one that handles water best, which is why it dominates bathrooms and holds up in an entrance hall. In exchange it is cold and unforgiving underfoot, heavier than the alternatives, and the most demanding of the surface beneath it. Once tile is the decision, the technical side of the work — setting out, cuts, joints and edges — belongs to tile installation.

What actually decides it

Rarely the sample. Usually how the room is used and how much traffic it takes, whether water is going to end up on the floor, what the surface underneath is and what it will tolerate, how much height is available, and what the rooms either side of it have. Budget matters, but it tends to be the last constraint rather than the first.

Underneath

Subfloors, and what the old floor was hiding

Nobody chooses a floor because of the base underneath it, and almost every floor that fails does so because of that base. It is also the one part of the job you cannot assess in a showroom, which is why we look at it before quoting rather than after the old covering comes up.

Two kinds of base, two kinds of problem. A timber subfloor can move: boards flex between joists, fixings work loose, and a floor that gives underfoot keeps giving under whatever is laid on it. A concrete base does not move, but it can be uneven, it can carry moisture, and it is often covered in whatever the last three floors were stuck down with. The two need entirely different preparation.

What the old covering leaves behind. Adhesive residue, staples, tack strip, patches of old levelling compound, and occasionally a surface nobody has seen since the property was built. A base that seemed sound under carpet frequently turns out not to be once the carpet is up. Removal and disposal of the old floor is part of the job, and so is dealing with what it was hiding.

Moisture is checked, not assumed. Wood-based products are particularly sensitive to what comes up through a base, so we check as part of the estimate rather than taking a view. Two limits are worth stating plainly: a check describes the condition on the day, and a new floor is not a remedy for a water problem. Where something is actively getting in, the source has to be found and dealt with first, or the same problem reappears under a newer floor.

Levelling, and how much variation a covering will accept. Minor variation is normal in any property. Anything beyond tolerance is levelled before the covering goes down, because it will otherwise telegraph through the finish. How much a base can get away with depends on what is going on it: a resilient covering follows a gentle undulation, a rigid one reports it. Tile is the least forgiving of the five, and tile installation covers why in detail.

Checked before a price is given

What the base is made of — Timber and concrete are different jobs.

Whether it moves — Loose boards and springy joists are corrected, not covered over.

Moisture, where it is relevant — Checked rather than assumed, and reported honestly.

What the old floor left — Adhesive, staples, tack strip, old compound.

How much variation there is — And whether the chosen covering will accept it.

How much height is available — Which can change what is realistic.

Build-Up

A new floor changes the height of the room

Every floor is a stack rather than a surface: whatever is under it, whatever goes between, and the covering itself. That stack has a total thickness, and swapping one covering for another changes it. It is the constraint people discover last and the one that most often forces a decision to be revisited.

Systems are not interchangeable thicknesses

An underlay with a floating laminate over it is a different build-up from engineered board fixed down, which is different again from tile on its bed. Replacing one with another rarely lands at the same finished height, so the covering and the build-up have to be decided together rather than the covering first.

Doors are the first thing to hit

Internal doors have a fixed frame and a finite gap underneath. A floor that comes up higher than the old one either needs the doors easing or needs a thinner build-up. External doors are less forgiving still, because the threshold and the weather seal are fixed. All of it is cheap to establish before ordering and awkward afterwards.

Fixed heights you cannot move

A stair nosing, a fitted kitchen plinth, a sliding door track, a shower tray, an existing threshold into another room. These set the level the new floor has to arrive at, and they are the reason a floor sometimes has to be built up rather than simply laid.

Where two systems meet

A junction between two coverings of different thickness is taken up by a trim or threshold profile chosen for the actual difference in height, not for the look alone. That means both floors need specifying together. Deciding one now and the other next year is how you end up with a junction that has to be worked around instead of designed.

Skirting, beading and the expansion gap

Floating floors need a gap at the perimeter to move, and that gap has to be covered. Either the skirting comes off and goes back down onto the new floor, or a beading is run against the existing skirting. The first looks better and costs more; the second is quicker. It is worth choosing rather than defaulting to whichever is easier on the day.

When there is no height to give

Occasionally the available height decides the covering rather than the other way round — a low door, a fixed threshold, or an acoustic layer that has to be accommodated. When that is the case it is far better established at the estimate than after a material has been chosen and ordered.

Condos And Apartments

In a condo, the rules come before the choice

A great deal of Chicago housing is stacked, and flooring in a stacked building is governed by rules rather than by preference. The single most useful thing you can do before choosing anything is read what your association actually requires, because it will narrow the options before taste does.

Acoustic requirements are the usual one. Many buildings require hard flooring to be laid over an underlay meeting a stated acoustic rating. What that rating is, which rooms it applies to, and what evidence has to be produced are set by the building, not by us. We advise on build-ups that meet what your association asks for and supply the paperwork they request.

The rules are the building’s, and they vary. Some associations limit how much of a unit can be hard flooring. Some require soft covering in bedrooms. Some specify working hours, notice to neighbours, or approval of the product before anything is ordered. We plan the work around what your building requires and tell you where a choice will not clear it — but the requirement itself is theirs to set and not ours to vary.

An acoustic layer is another layer. It adds to the stack, which puts you straight back into door clearance and thresholds. In a unit with limited height that is occasionally the constraint that decides the covering, and it is much better to know before a material is ordered than after it arrives.

And the logistics are genuinely different. Elevator bookings, protection of common areas, getting the old floor out of an upper-floor unit, and the working hours a building allows all shape the programme in a way they simply do not in a house. None of it is technical, and all of it is worth agreeing before a start date is set rather than discovered on the first morning.

What a building may ask for

An underlay meeting a stated rating — The figure is the association’s, not ours.

Product details before ordering — Some buildings approve the specification first.

Paperwork on completion — We supply what your association asks for.

Limits on hard flooring — Certain rooms may have to stay soft-covered.

Working hours the building allows — Which shapes the programme, not the price alone.

Elevator and common-area protection — Booked and protected before anything moves.

Our Process

How the work runs

01

Consultation

We visit the property, discuss the finish you want and give you a clear written estimate.

02

Preparation

Furniture protected, surfaces repaired, sanded and primed. Preparation is most of the job.

03

Professional Work

Our team completes the work to schedule, keeping the site tidy at the end of every day.

04

Final Inspection

We walk the finished work with you and correct anything before we call it done.

Related Services

Often booked together

Most projects touch more than one trade. We can handle the related work at the same time.

Tile Installation

Ceramic, porcelain and stone.

Home Remodeling

Whole-property projects.

Interior Painting

Decoration before flooring goes down.

Recent Work

Projects like yours

Kitchen Flooring by Goodman Painters and Decorators in Chicago

Kitchen Flooring

Naperville, IL

Home Remodel by Goodman Painters and Decorators in Chicago

Home Remodel

Chicago, IL

Commercial Flooring by Goodman Painters and Decorators in Chicago

Commercial Flooring

Chicago, IL

Service Areas

Flooring Installation across Chicagoland

We cover Chicago and the surrounding suburbs. Choose your area to see local details.

FAQ

Common questions

Still unsure? Call (872) 235-7481 and we will talk it through.

Yes, removal and disposal is included unless you would rather handle it. We will confirm either way in the estimate.
We check as part of the estimate. Minor variation is normal; anything beyond tolerance gets levelled first, because it will show through the finished floor otherwise.
Many buildings require an acoustic underlay rating. We can advise on compliant build-ups and supply the paperwork your association asks for.
Yes. We regularly fit client-supplied flooring. We will check the material and quantities before scheduling.
Start with the room rather than the sample. Solid hardwood is the most sensitive of the four to humidity and standing water, so it suits living space where those conditions can be relied on. Engineered board gives a real timber surface on a more stable core and copes with a wider range of conditions. Laminate is the least expensive of the wood-look options and hard-wearing, but water sitting on its joints is what usually finishes it. Luxury vinyl is resilient rather than rigid, quieter and warmer underfoot, and tolerates moisture far better than anything wood-based, which is why it is common in kitchens and hallways. What is underneath, and how much height you have, will narrow that list further.
Usually, yes, by a small amount — and it matters more than the number suggests. A floor is a stack: the base, whatever goes between, and the covering. Different systems come out at different total thicknesses, so replacing one with another rarely lands at the same finished level. The things that notice first are doors, which have a fixed frame and a finite gap underneath, and any fixed height the floor has to meet such as a stair nosing, a kitchen plinth or a threshold into the next room. We establish the available height at the estimate, because it occasionally decides the covering rather than the other way round.
Sometimes, and it depends entirely on what is already there and what is going on top. The existing surface has to be sound, well fixed and flat enough for the new covering, and there has to be height available for the extra build-up without creating a problem at doors and thresholds. Where the existing floor is loose, uneven or hiding a moisture issue, laying over it transfers the problem rather than solving it. We would rather lift it, look, and tell you which of those you have.
In most Chicago condo and apartment buildings, yes. Associations commonly want to know what is being laid before it is ordered, require hard flooring to sit on an underlay meeting a stated acoustic rating, and set working hours, elevator bookings and protection of common areas. Some also limit how much of a unit can be hard flooring. Those requirements are the building’s to set; what we do is advise on build-ups that meet what your association asks for, supply the paperwork they request, and plan the work around the access and hours the building allows.
Both, and the distinction is useful. Tile is one of the coverings worth considering for a floor, and comparing it against wood, laminate and vinyl for a particular room is a flooring decision. Once tile is the answer, the work itself is a specialism with its own technical decisions — setting out so the cuts fall where they should, joints, edges and transitions — and that belongs to tile installation. The practical version: this page helps you decide whether tile is right; that page covers doing it properly.

Get your free flooring installation estimate

Tell us about your project and we will send a clear, itemised estimate. No obligation.

Scroll to Top