Goodman Painters and Decorators

Bathroom Remodel Cost in Chicago

Bathroom remodel costs in Chicago range widely, from a cosmetic refresh that keeps everything in place to a full gut renovation with new plumbing, tile and fixtures. Two bathrooms of the same size can price very differently depending on what is behind the walls and what you choose to install. This guide explains what drives bathroom remodel cost, where the money goes and how to budget with confidence.

The Short Answer

How much does a bathroom remodel cost in Chicago? It depends mainly on scope. A cosmetic update that keeps the tub, toilet and plumbing where they are costs far less than a full gut remodel with new tile, a walk-in shower and moved plumbing. Tile choices, fixture quality, plumbing and electrical changes, permits and the condition of the subfloor and walls have the biggest effect on the final price. A walkthrough estimate is the only reliable way to get a real number.

The three common levels of bathroom remodel

What drives the cost

Where the budget usually goes

In most bathroom remodels, labor is the largest share of the budget, because demolition, waterproofing, tile setting, plumbing and finishing all take skilled time. Tile and fixtures are the next biggest line items. Keeping the toilet, tub or shower drain in the same place is one of the most effective ways to control cost, because moving plumbing adds both labor and permit work.

Ways to control bathroom remodel cost

Getting an accurate estimate

The most reliable way to budget is a walkthrough estimate, because bathroom remodels have more variables than most other home projects. A good estimate lists the scope room by room: demolition, waterproofing, tile, fixtures, plumbing, electrical, paint and cleanup, along with what is and is not included. Comparing estimates line by line explains most of the difference between two prices.

Frequently asked questions

A cosmetic refresh can take a few days to a week. A full gut remodel typically takes several weeks, depending on tile, custom items, inspections and material lead times.

Cosmetic updates often do not, but work that changes plumbing, electrical wiring or structure generally does. Requirements depend on the city or suburb, and your contractor should confirm them before work starts.

Usually, yes. Keeping the tub in place avoids plumbing changes and extra tile work. Converting a tub to a walk-in shower is popular but adds cost for new drains, waterproofing and glass.

Hidden water damage, rotted subfloor and outdated plumbing found during demolition. A good estimate explains how these will be handled and priced if they are discovered.

Get a Free Estimate for Your Project

Tell us about your painting, decorating or remodeling project and we will follow up with a clear, no-obligation estimate.

Ready to start your project?

Call Goodman Painters and Decorators or request a free written estimate. No obligation.

Scroll to Top